Published: 2019-04-30

ELEMENTS OF COST OVERRUNS,DELAYS AND RISK IN CONSTRUCTION MANAGEMENT

AKSHAY KARNAVAT, RAHUL KULCHANDANI, MAYUR LODHA

1-5

WORKFORCE EMPOWERMENT FOR EFFECTIVE CONSTRUCTION MANAGEMENT

MR. SUSHIL SHIVAJI DANGE, MR. SHRIDHAR DILIPRAO NIMBALKAR, MR. AJIT BHARAT MULE

1-5

MULTIFUNCTIONING OF AC BY RECOVERY OF LOST HEAT

PROF. SONAVANE SANTOSH K., NANGARE AKASH S., PATIL RUSHIKESH M.

1-7

COST EFFECTIVE ELECTRIC GO KART

MR. SUTAR SHUBHAM VASANT , MISS. AMATE MAYURI PANDURANG, MISS. GURAV DHANSHRI BALASO

1-3

MANUFACTURING OF AXIAL FLUX PERMANENT MAGNET GENERATOR

RUPALI CHAVAN, GHODAKE RUPALI, NARKHE AASHWINI

1-7

IOT BASED ENERGY MONITORING AND CONTROLLING OF HOME APPLINCES WITH THEFTDETECTION AND PREPAID BILLING

MR. NISHANT PRAMOD ADAKE, MR. ASHWIN ASHOK BHORE, MISS. PRIYANKA PANDURANG CHAVAN

1-8

ROAD POWER GENERATION USING BYSPEED BREAKER

MR. PATIL SHRINIVAS B., MR.PATIL ONKAR A., MR. LOKHANDE SHIVPRASAD B.

1-6

CASE STUDY OF SOLAR ENERGY

MISS. PATIL POONAM SAMBHAJI , MISS. PATIL SHITAL SARJERAO, MISS. BHOSALE SUNITA SHIVAJI

1-7

LOAD SHADDING TIME MANGMENT WITH PROGRAMMABLE INTERFACE

MISS. RAJARAM VARSHA V., MISS. KADAM ANKITA R., MISS. SALAVI KOMAL D.

1-6

ELECTRICAL POWER SYSTEM WORKING MODEL

MR. PATIL SAURABH PRAKASH, MR. MORBALE HARSHVARDHAN SANJAY, MISS. PATIL SNEHAL SUBHASH

1-4