OPTIMIZATION TECHNOLOGY FOR THE CONSTRUCTION OF A PIT FOR A MULTI-STOREY BUILDING

Main Article Content

Kurbanov Ravshan Ulmasovich
Normurodov Alisher Raufovich

Abstract

The latest developments in the design and construction of deep pits and slopes in urban development are described. The latest developments, especially in the fields of instrumentation and measuring methods, are considered. It is shown that investment in complex preparatory work and monitoring contributes to an increase in the efficiency of project implementation. Making an optimal decision requires not only time and knowledge, but also the conscious cooperation of all interested parties and specialists.

Downloads

Download data is not yet available.

Article Details

How to Cite
Kurbanov Ravshan Ulmasovich, & Normurodov Alisher Raufovich. (2021). OPTIMIZATION TECHNOLOGY FOR THE CONSTRUCTION OF A PIT FOR A MULTI-STOREY BUILDING. International Journal of Innovations in Engineering Research and Technology, 1, 1-9. https://repo.ijiert.org/index.php/ijiert/article/view/2349
Section
Articles

How to Cite

Kurbanov Ravshan Ulmasovich, & Normurodov Alisher Raufovich. (2021). OPTIMIZATION TECHNOLOGY FOR THE CONSTRUCTION OF A PIT FOR A MULTI-STOREY BUILDING. International Journal of Innovations in Engineering Research and Technology, 1, 1-9. https://repo.ijiert.org/index.php/ijiert/article/view/2349

Similar Articles

You may also start an advanced similarity search for this article.