OVERVIEW OF CRITICAL CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
Keywords:
Construction management,, critical chain management, project managementAbstract
Quality of any construction project is judged by the time taken for completion, the cost effectiveness and the design considerations for the effective space utilization. If any of these factors are not considered or affected, it is going to affect the total project. Delays in the construction projects are common due to certain reasons and the failures of the management. Lower time for completion of the project may results in more profit to the industry. Planning of every project despite of the size of the project is very critical aspect for the timely completion and cost effectiveness of the project. The researchers in the construction management area have proposed the concept of the chain management for the construction projects and it is found suitable. It is provenin the research over last decade that the chain management has saved the cost of project and reduces the time required for completion by optimum use of the available resources. Authors have presented the overview of the critical chain management for the construction projects.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License (CC BY-NC-ND 4.0 DEED).
You are free to:
- Share — copy and redistribute the material in any medium or format
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- NonCommercial — You may not use the material for commercial purposes .
- NoDerivatives — If you remix, transform, or build upon the material, you may not distribute the modified material.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.
Rights of Authors
Authors retain the following rights:
1. Copyright and other proprietary rights relating to the article, such as patent rights,
2. the right to use the substance of the article in future works, including lectures and books,
3. the right to reproduce the article for own purposes, provided the copies are not offered for sale,
4. the right to self-archive the article.