(1)
Mubarokah N Dewi. ECONOMIC FEASIBILITY STUDY BIOGAS POWER PLANT AT 80 TON HOUR PALM OIL MILL. Int. j. innov. eng. res. technol. 2021, 7 (06), 43-48.